日本語|English

Subcommittee on Sustainability of Steel Structures

Committee Overview

●Proposers
Chair: Kazuyuki Mizuguchi (NEXCO East Engineering Co., Ltd.)
Secretary-General: Shiro Saito (IHI Infrastructure Systems Co., Ltd.)

●Purpose of Establishment, Objectives, and Activities
In October 2020, then Prime Minister Suga declared Japan’s goal of achieving “Carbon Neutrality by 2050,” and the Ministry of Economy, Trade and Industry subsequently formulated the “Green Growth Strategy Through Achieving Carbon Neutrality in 2050.” In Europe and the United States, reducing CO2 emissions from the construction industry has become an important issue. Although Japan has lagged behind in this field, interest has increased rapidly in recent years. In Europe, there have been cases in which lightweight timber bridges won design competitions because reducing the use of concrete was considered effective in lowering CO2 emissions. Steel structures are lighter than concrete structures and therefore have the potential to contribute to CO2 reduction. However, since most CO2 emissions associated with steel bridge construction originate from materials, there are high expectations for steel manufacturers to develop “zero-carbon steel” technologies, including hydrogen reduction and CCUS. At the same time, the steel structure industry should not rely solely on technological development by steel manufacturers, but should also pursue technologies that contribute to reducing CO2 emissions.
Against this background, this Committee investigates the environmental impacts associated with the fabrication, erection, and maintenance of steel structures, as well as technologies that contribute to reducing environmental loads, and systematically organizes the findings.

●Method of Activities
The full committee will meet approximately once every three to four months to collect case studies on CO2 reduction initiatives in a wide range of fields in Japan and overseas and to consider the future direction of the steel structure industry. Working groups will be established as necessary for case collection and systematic organization.

●Activity Period
Three years (April 2024 – March 2027)

Committee Members

PositionNameAffiliation
ChairKazuyuki MizuguchiYokogawa Bridge Corp.
Secretary-GeneralShiro SaitoIHI Infrastructure Systems Co., Ltd.
Deputy Secretary-GeneralYugo SuzukiNEXCO East Engineering Co., Ltd.
MemberKoichi IkeyaNippon Expressway Research Institute Company Limited
MemberDaisaku IshiharaPacific Consultants Co., Ltd.
MemberTakashi InoseMiyaji Engineering Co., Ltd.
MemberHiroshi UedaTakigami Steel Construction Co., Ltd.
MemberYuta UeyamaEast Japan Railway Company
MemberTakuji ObataHokkai-Gakuen University
MemberMori KatsumataKawada Industries, Inc.
MemberKentaro KimuraJapan Railway Construction, Transport and Technology Agency
MemberYasuyuki KuriharaJFE Steel Corporation
MemberChie SakuraiYokogawa Bridge Corp.
MemberYusuke SatoCentral Research Institute of Electric Power Industry
MemberMichiaki TakaoJFE Engineering Corporation
MemberShuichi TayaCentral Japan Railway Company
MemberShozo NakamuraNagasaki University
MemberSumire NakamuraNational Institute of Maritime, Port and Aviation Technology
MemberTomohiro NishibataMetropolitan Expressway Company Limited
MemberYasuhiro HiranoNippon Sharyo, Ltd.
SecretaryMasakazu TakenoNippon Steel Corporation
ObserverMasashi HattoriCentral Nippon Expressway Company Limited

Last Updated:2026/02/10

Activities

PDF icon December 1, 2023 – Minutes of the 1st Subcommittee Establishment Meeting
PDF icon April 9, 2024 – Minutes of the 2nd Subcommittee Establishment Meeting
PDF icon May 10, 2024 – Minutes of the 3rd Subcommittee Establishment Meeting
PDF icon June 6, 2024 – Minutes of the 1st Committee Meeting
PDF icon October 18, 2024 – Minutes of the 2nd Committee Meeting
PDF icon March 26, 2025 – Minutes of the 3rd Committee Meeting